Antall eller omfang
Further details on the contract work is in the attached document Contract E09 Lift.E09 Lift:— Lift.The project is divided into the following contracts:— R01 Barracks;— R02 Demolition work;— E01 Ground and outdoor work;— E02 Concrete and steel work;— E03 Joinery, locks and fittings and roofing work;— E04 Painting, floor and tiling work;— E05 Glass and aluminium work;— E06 Plumbing installations;— E07 Air treatment system;— E08 Electricity, telecommunications and control plant;— E09 Lift.1 contract will be awarded for each contract, based on separate tender documentation that will be announced in Doffin.500 0001 000 000