Antall eller omfang
Further details on the contract work is in the attached document Contract E01 Ground and Outdoor Work,Contract E01 Ground and Outdoor Work includes:— Ground work— Piling work— Preparations for concrete work— Water and sewage and ditch work— Outdoor workThe project is divided into the following contracts:— R01 Barracks— R02 Demolition work— E01 Ground and outdoor work— E02 Concrete and steel work— E03 Joinery, locks and fittings and roofing work— E04 Painting, floor and tiling work— E05 Glass and aluminium work— E06 Plumbing installations— E07 Air treatment system— E08 Electricity, telecommunication and control plant— E09 LiftOne contract will be awarded for each contract, based on separate tender documentation that will be announced in Doffin.7 000 00010 000 000