Antall eller omfang
There are the following main quantities:Ånestad Grindalsmoen— Top soil 3,525 m3— Vegetation cover 530 m3 1 300 m3— Uncompacted matter in cutting, 6,700 m3, 112 250 m3— Road filling 9,500 m3, 3,000 m3— Drainage pipes 1,775 m3, 3,100 m— Stormwater pipes 570 m, 140 m— Water pipes 40 m— Cable ditches 1,700 m, 3,850 m— Sand traps 38, 50— Inspection manholes 7 units, 3 units.— Fibre cloth on formation level 16,000 m2, 41,000 m2— Reinforcement layer of 9,150 m3 22,750 m3— Base course of Fk 11/63,550 m3 and 1, 700 m3— Base course of Aggregate: 6,700 m2, 25,950 m3— Demolition of asphalt, 1,650 m2, 16,700 m2— Base course of Agb 4,700 m2, 6,400 m2— Base course of Ab 6,600 m2, 9,500 m2— Base course of Ab Pmb 16,150 m2— Wearing Course of Agb 4,700 m2, 7,500 m2— Wearing Course of Ab 6,500 m2, 9,300 m2— Wearing Course of Ab Pmb 16,000 m2— Large and small cobblestones, 70 m2, 700 m2— Top soil for refuges 25 m3 250 m3— Trees 22, 23— Trees, moving 0, 7— Kerbstone 1,275 m, 2,830 m— Railings 140 m, 440 m— Street lights masts 42, 103— Distribution cupboard, 1, 2— Number of sign locations 40, 60— Marking 2,275 m, 6,900 m— Concrete 57 m3 835 m3— Reinforcement 17 tonne, 182 tonne— Form work 186 m2, 1 900 m2ÅDT on National Road 3/25 at Ånestad is approx. 8,000 west of the junction with National Road 3 and approx. 17,000 east of this junction. At Grindalsmoen ADT is approx. 18,000.100 000 000120 000 000