The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, Fv.540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along Fv.540 Bjørgeveien The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other. In addition a new footbridge of approx. 110 metres shall be established over county road 540, by the outlet of Sælevatnet. Some main elements in the contract: Reception of approx. 180 000 m3 stone for a filling in Sælevatnet. Demolition of 2 houses. Development of approx. 1000 m foot and cycle path. Alterations and improvements of Fv.540 at Sandeide Construction of a footbridge, approx. 110 m with a cross section of approx. 4.3 m. The expansion of the Sælenkanalen (Sælen channel), organised by Bergen Municipality. The project will be implemented based on drafts.
Frist
Fristen for mottak av tilbud var 2016-12-21.
Anskaffelsen ble publisert 2016-11-24.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2016-11-24) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Antall eller omfang:
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, Fv.540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along Fv.540 Bjørgeveien The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.In addition a new footbridge of approx. 110 metres shall be established over county road 540, by the outlet of Sælevatnet.Some main elements in the contract:Reception of approx. 180 000 m3 stone for a filling in Sælevatnet.Demolition of 2 houses.Development of approx. 1000 m foot and cycle path.Alterations and improvements of Fv.540 at SandeideConstruction of a footbridge, approx. 110 m with a cross section of approx. 4.3 m.The expansion of the Sælenkanalen (Sælen channel), organised by Bergen Municipality.The project will be implemented based on drafts.
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, Fv.540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along Fv.540 Bjørgeveien The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.In addition a new footbridge of approx. 110 metres shall be established over county road 540, by the outlet of Sælevatnet.Some main elements in the contract:Reception of approx. 180 000 m3 stone for a filling in Sælevatnet.Demolition of 2 houses.Development of approx. 1000 m foot and cycle path.Alterations and improvements of Fv.540 at SandeideConstruction of a footbridge, approx. 110 m with a cross section of approx. 4.3 m.The expansion of the Sælenkanalen (Sælen channel), organised by Bergen Municipality.The project will be implemented based on drafts.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Departement eller annen nasjonal eller føderal myndighet
Navn på tildelende myndighet: Statens Vegvesen Region vest [The Norwegian Public Roads Administration, Western Region]
Postadresse: Askedalen 4
Postnummer: 6863
Poststed: Leikanger
Kontakt
E-post: firmapost-vest@vegvesen.no📧
Telefon: +47 02030📞
Faks: +47 57655986 📠
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, Fv.540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along Fv.540 Bjørgeveien The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, Fv.540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along Fv.540 Bjørgeveien The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
In addition a new footbridge of approx. 110 metres shall be established over county road 540, by the outlet of Sælevatnet.
Some main elements in the contract:
Reception of approx. 180 000 m3 stone for a filling in Sælevatnet.
Demolition of 2 houses.
Development of approx. 1000 m foot and cycle path.
Alterations and improvements of Fv.540 at Sandeide
Construction of a footbridge, approx. 110 m with a cross section of approx. 4.3 m.
The expansion of the Sælenkanalen (Sælen channel), organised by Bergen Municipality.
The project will be implemented based on drafts.
Antall eller omfang:
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, Fv.540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along Fv.540 Bjørgeveien The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, Fv.540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along Fv.540 Bjørgeveien The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
In addition a new footbridge of approx. 110 metres shall be established over county road 540, by the outlet of Sælevatnet.
Some main elements in the contract:
Reception of approx. 180 000 m3 stone for a filling in Sælevatnet.
Demolition of 2 houses.
Development of approx. 1000 m foot and cycle path.
Alterations and improvements of Fv.540 at Sandeide
Construction of a footbridge, approx. 110 m with a cross section of approx. 4.3 m.
The expansion of the Sælenkanalen (Sælen channel), organised by Bergen Municipality.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: See the tender documentation.
Økonomisk og finansiell stilling: See the tender documentation.
Teknisk og faglig kapasitet: See the tender documentation.
Kontraktutførelse
Innskudd og garantier som kreves: See the tender documentation.
Prosedyre
Tilbudets gyldighetsperiode: 2017-02-28 📅
Dato for åpning av tilbud: 2016-12-21 📅
Åpningssted (organisasjon): Statens vegvesen [The Norwegian Public Roads Administration]
Åpningssted (by): Leikanger
Informasjon om autoriserte personer og åpningsprosedyre:
The opening of tenders will take place at the Regional Road Office in Leikanger.
Address: Askedalen 4, 6863 Leikanger.
All tenderers have access to the meeting.
Språk
Andre språk: Norwegian.
Vilkår for åpning av tilbud
Adresse: Askedalen 4
Kunngjøring om tildeling av kontrakt (2017-02-22) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, county road 540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along county road 540 Bjørgeveien. The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
In addition a new footbridge of approx. 110 metres shall be established over county road 540, by the outlet of Sælevatnet.
Some main elements in the contract:
Reception of approx. 180 000 m
Demolition of 2 houses.
Development of approx. 1 000 m foot and cycle path.
Alterations and improvements of county road 540 at Sandeide.
Construction of a footbridge, approx. 110 m with a cross section of approx. 4.3 m.
The expansion of the Sælenkanalen (Sælen channel), organised by Bergen Municipality.
The project will be implemented based on drafts.
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, county road 540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along county road 540 Bjørgeveien. The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
In addition a new footbridge of approx. 110 metres shall be established over county road 540, by the outlet of Sælevatnet.
Some main elements in the contract:
Reception of approx. 180 000 m
Demolition of 2 houses.
Development of approx. 1 000 m foot and cycle path.
Alterations and improvements of county road 540 at Sandeide.
Construction of a footbridge, approx. 110 m with a cross section of approx. 4.3 m.
The expansion of the Sælenkanalen (Sælen channel), organised by Bergen Municipality.
The project will be implemented based on drafts.
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Utførelsessted
NUTS-region: Hordaland
🏙️
Prosedyre
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Statens vegvesen Region vest
Kontakt
Internettadresse: http://www.vegvesen.no🌏
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, county road 540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along county road 540 Bjørgeveien. The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
The Norwegian Public Roads Administration shall construct a foot and cycle path between Straume and Sandeidet, county road 540. The main objective of the contract is to establish sections of the main route for the foot and cycle path along county road 540 Bjørgeveien. The existing foot and cycle path is to be altered and expanded, so that pedestrians and cyclists are separated from each other.
Reception of approx. 180 000 m
Development of approx. 1 000 m foot and cycle path.
Alterations and improvements of county road 540 at Sandeide.
Utførelsessted
Hovedsted eller utførelsessted: County road 540 Bjørgeveien -Straume-Sandeide.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2017-02-10 📅
Oppdragsgiver Kontakt
Kontaktpunkt: Bernt Kristen Vallestad