The work comprises both building, construction and electrical disciplines. About the tunnels: Innfjord tunnel was opened in 1991, is 6 594 m long and has a cross section of T8,5/9. Approx. 550 m of the tunnel (the northern end) is an older tunnel (part of Skafonna). Måndals tunnel was opened in 1993, is 2 083 m long and has a cross section of T8,5. Phase 1 of the improvement was carried out in 2014/2015, which consisted of replacing the lighting installations and laying new fibre cable. Main work: The existing electro-technical installations, safety equipment and water and frost protection shall be demolished and removed and new installations shall be established in both tunnels. New turning niches shall be made and bolts shall be put on the walls in order to make room for a concrete railing through the tunnel. New cable installations shall be established behind the concrete railing. Emergency stations and SRO installations shall be installed.
Frist
Fristen for mottak av tilbud var 2016-06-01.
Anskaffelsen ble publisert 2016-04-19.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2016-04-19) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Antall eller omfang:
Approx. amounts for the main work:Innfjord tunnel:Cleaning: 25 300 m2;Rock bolts: Approx. 4 600.Shotcrete 2 350 m3;Disassembly of water and frost protection (half vault) 3 200 m2;Disassembly of water and frost protection (whole vault) 19 100 m2;Assembly of new water and frost protection 30 300 m2;Bolting 400 m3;Blasting for turning niches and technical buildings 18 700 m3;Concrete guiding edge 11 200 m;Cable ladders 6 900 m;New fans (directional control fans) 38;New technical buildings 6;Gas detectors CO/NO, wind gauges, dust and visibility meters, thermometers 15;LED lighting installations in the entire tunnel, as well as niches, approx. 7 000 m;Distribution and control boards in technical buildings 36;LED safety lighting, each 4th fitting in the whole tunnel, approx. 7 000 m;LED emergency lighting strip 6 600 m;Emergency stations wall mounted with the accompanying signs 48;Emergency telephone kiosks 6;Aerial cables for Tetra, as well as access cables 6 600 m;Video surveillance with AID and PTZ dome camera 61;Fibre cables with the accompanying patch panel 15 500 m;Loudspeakers 132.Måndals tunnel:Cleaning: 17 000 m2;Rock bolts 820;Shotcrete 300 m3;Disassembly of water and frost protection (halve vault) 900 m2;Disassembly of water and frost project (whole vault) 16 000 m2;Assembly of new water and frost protection 18 500 m2;Bolting 130 m3;Blasting for turning niches and technical buildings 3 900 m3;Concrete guiding edge 4 200 m;Cable ladders 70 m;New fans (directional control fans) 8;New technical buildings 3;Gas detectors CO/NO, wind gauges, dust and visibility meters, thermometers 11;New distribution and control boards in technical buildings 5;LED emergency lighting fittings 83;Emergency stations wall mounted with the accompanying signs 14;Emergency telephone kiosks 3;Fibre cables with the accompanying patch panel 2 600 m.The amounts in chapter D1 take precedence if there are contradicting amounts.220320
Approx. amounts for the main work:Innfjord tunnel:Cleaning: 25 300 m2;Rock bolts: Approx. 4 600.Shotcrete 2 350 m3;Disassembly of water and frost protection (half vault) 3 200 m2;Disassembly of water and frost protection (whole vault) 19 100 m2;Assembly of new water and frost protection 30 300 m2;Bolting 400 m3;Blasting for turning niches and technical buildings 18 700 m3;Concrete guiding edge 11 200 m;Cable ladders 6 900 m;New fans (directional control fans) 38;New technical buildings 6;Gas detectors CO/NO, wind gauges, dust and visibility meters, thermometers 15;LED lighting installations in the entire tunnel, as well as niches, approx. 7 000 m;Distribution and control boards in technical buildings 36;LED safety lighting, each 4th fitting in the whole tunnel, approx. 7 000 m;LED emergency lighting strip 6 600 m;Emergency stations wall mounted with the accompanying signs 48;Emergency telephone kiosks 6;Aerial cables for Tetra, as well as access cables 6 600 m;Video surveillance with AID and PTZ dome camera 61;Fibre cables with the accompanying patch panel 15 500 m;Loudspeakers 132.Måndals tunnel:Cleaning: 17 000 m2;Rock bolts 820;Shotcrete 300 m3;Disassembly of water and frost protection (halve vault) 900 m2;Disassembly of water and frost project (whole vault) 16 000 m2;Assembly of new water and frost protection 18 500 m2;Bolting 130 m3;Blasting for turning niches and technical buildings 3 900 m3;Concrete guiding edge 4 200 m;Cable ladders 70 m;New fans (directional control fans) 8;New technical buildings 3;Gas detectors CO/NO, wind gauges, dust and visibility meters, thermometers 11;New distribution and control boards in technical buildings 5;LED emergency lighting fittings 83;Emergency stations wall mounted with the accompanying signs 14;Emergency telephone kiosks 3;Fibre cables with the accompanying patch panel 2 600 m.The amounts in chapter D1 take precedence if there are contradicting amounts.220320
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Departement eller annen nasjonal eller føderal myndighet
Navn på tildelende myndighet: Statens vegvesen Region midt (The Norwegian Public Roads Administration, Region Mid-Norway)
Postadresse: Fylkeshuset
Postnummer: 6404
Poststed: Molde
Kontakt
E-post: jon-trygve.lovik@vegvesen.no📧
Telefon: +47 97091363📞
A tender conference and site inspection will start (with lunch) at the project office at Vikebukt (by the fast boat quay) in Vestnes municipality at 11:30. The site inspection will be made by joint bus transport from/to the project office.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The work comprises both building, construction and electrical disciplines.
About the tunnels:
Innfjord tunnel was opened in 1991, is 6 594 m long and has a cross section of T8,5/9.
Approx. 550 m of the tunnel (the northern end) is an older tunnel (part of Skafonna).
Måndals tunnel was opened in 1993, is 2 083 m long and has a cross section of T8,5.
Phase 1 of the improvement was carried out in 2014/2015, which consisted of replacing the lighting installations and laying new fibre cable.
Main work:
The existing electro-technical installations, safety equipment and water and frost protection shall be demolished and removed and new installations shall be established in both tunnels. New turning niches shall be made and bolts shall be put on the walls in order to make room for a concrete railing through the tunnel.
The existing electro-technical installations, safety equipment and water and frost protection shall be demolished and removed and new installations shall be established in both tunnels. New turning niches shall be made and bolts shall be put on the walls in order to make room for a concrete railing through the tunnel.
New cable installations shall be established behind the concrete railing. Emergency stations and SRO installations shall be installed.
Antall eller omfang:
Approx. amounts for the main work:
Innfjord tunnel:
Cleaning: 25 300 m
Rock bolts: Approx. 4 600.
Shotcrete 2 350 m
Disassembly of water and frost protection…
… (half vault) 3 200 m
… (whole vault) 19 100 m
Assembly of new water and frost protection 30 300 m
Bolting 400 m
Blasting for turning niches and technical buildings 18 700 m
Concrete guiding edge 11 200 m;
Cable ladders 6 900 m;
New fans (directional control fans) 38;
New technical buildings 6;
Gas detectors CO/NO, wind gauges, dust and visibility meters, thermometers 15;
LED lighting installations in the entire tunnel, as well as niches, approx. 7 000 m;
Distribution and control boards in technical buildings 36;
LED safety lighting, each 4
LED emergency lighting strip 6 600 m;
Emergency stations wall mounted with the accompanying signs 48;
Emergency telephone kiosks 6;
Aerial cables for Tetra, as well as access cables 6 600 m;
Video surveillance with AID and PTZ dome camera 61;
Fibre cables with the accompanying patch panel 15 500 m;
Loudspeakers 132.
Måndals tunnel:
Cleaning: 17 000 m
Rock bolts 820;
Shotcrete 300 m
Disassembly of water and frost protection (halve vault) 900 m
Disassembly of water and frost project (whole vault) 16 000 m
Assembly of new water and frost protection 18 500 m
Bolting 130 m
Blasting for turning niches and technical buildings 3 900 m
Concrete guiding edge 4 200 m;
Cable ladders 70 m;
New fans (directional control fans) 8;
New technical buildings 3;
Gas detectors CO/NO, wind gauges, dust and visibility meters, thermometers 11;
New distribution and control boards in technical buildings 5;
LED emergency lighting fittings 83;
Emergency stations wall mounted with the accompanying signs 14;
Emergency telephone kiosks 3;
Fibre cables with the accompanying patch panel 2 600 m.
The amounts in chapter D1 take precedence if there are contradicting amounts.
Estimert verdi eksklusive mva: 220 💰
320 💰
Beskrivelse av opsjoner:
Chapter C3 point 15,8 Option ‘Evacuation Room’.
See the process 32.115 and 32.25 for Place B Innfjord tunnel.
A decision of whether the option will be taken up will be made by 15.9.2016.
Foreløpig tidsplan for bruk av opsjoner: 75 dager
Varighet: 22 måneder
Referansenummer: 16/32122
Utførelsessted
Hovedsted eller utførelsessted: Rauma, Norway.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: See the tender documentation.
Økonomisk og finansiell stilling: See the tender documentation.
Teknisk og faglig kapasitet: See the tender documentation.
Kontraktutførelse
Innskudd og garantier som kreves: See the tender documentation.
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: See the tender documentation.
Juridisk form som skal antas av gruppen av økonomiske operatører som kontrakten skal tildeles til: See the tender documentation.
Andre særlige vilkår: Cf. Chapter C2 point 4.3.
Prosedyre
Tilbudets gyldighetsperiode: 2016-07-27 📅
Dato for åpning av tilbud: 2016-06-01 📅
Åpningssted (organisasjon): Statens vegvesen (The Norwegian Public Roads Administration)
Åpningssted (by): Molde
Åpningssted: Fylkeshuset, 3rd floor.
Sted: Fylkeshuset, 3
Informasjon om autoriserte personer og åpningsprosedyre: Open to the public.
Språk
Andre språk: Norwegian.
Vilkår for åpning av tilbud
Adresse: Julsundvegen 9
Kunngjøring om tildeling av kontrakt (2016-09-02) Gjenstand Anskaffelsens omfang
Totalverdi for anskaffelsen: 385 728 051 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Statens vegvesen Region midt (The Norwegian Public Roads Administration, Mid Norway Region)
Tildeling av kontrakt
Dato for kontraktinngåelse: 2016-06-24 📅
Navn: AF Gruppen Norge AS
Postadresse: Innspurten 15
Poststed: Postboks 6272 Etterstad
Postnummer: 0603
Land: Norge 🇳🇴
E-post: firmapost@afgruppen.no📧
Internettadresse: http://www.afgruppen.no🌏 Informasjon om tilbud
Antall mottatte tilbud: 4