Antall eller omfang
An electro contract for a new building with a basal area of 11 000 m2.1-4 floors.The building contains the following main areas:— Reception hall for waste,— Waste sorting hall,— Washing hall,— Storage hall for sorted fractions,— Administration wing with changing rooms and social rooms in 4 floors,— Various technical rooms and laboratories.Processing plants:There are 2 different processing plants that shall be included in the building: a sorting plant and a washing/manufacturing plant. The processing plants have separate electrical boards for the installations. These are located in the MCC rooms. All processing plants, including electrical installation and electrical boards shall be constructed in accordance with the machinery, and amending Directive, and be installed by the supplier of the processing plants.The interface between the electro contractor and the processing suppliers is at the main distributions. The processing suppliers shall convey the cables to the main distributions and the electro contractor shall lead the cables into the main distributions and connect them.The sorting plant has 2 main distributions which are supplied from 1 transformer each. The transformers have a capacity of 1 600 kVA. The washing plant has 2 main distributions which are supplied from 1 transformer each. The transformers have a capacity of 2 000 kVA. The washing plant has also made room for further installations and a 3rd transformer with a capacity of 2 000 kVA.All works shall be coordinated against Lyse's works and against the processing plant that shall be installed in the building.