Upgrading the sewage transport system Brumunddal-Hias treatment plant

Hias IKS

Hias IKS has several pipelines with a high degree of sewage supply from the nutrition industry. The longest transfer is currently from Brumunddal to Rosenlundvika at Hamar, and then on to Tjuvholmen and the treatment plant in Stange. In Brumunddal the previous treatment plant is used as premises for pumping sewage southwards. The transfer from Brumunddal to Rosenlundvika was established in 1989/1990 and consists of 1 Ø 400 mm PE and 1 Ø 250 PE which are in daily operation.
A hotel shall be constructed on the site where the current pump station/treatment plan is and the new pump station shall therefore be established on a new site in Brumunddal. This means that the existing pipeliens must be altered. As the capacity of the pipelines is limited and the consequences of breaks in the pipelines are great, a new pipeline is wanted from Brumunddal and the existing pump pipelines will then be shut off and only used as back-up.
The project is planned to be carried out in 2 phases and four general contracts. Phase 1 consists of a new Brumunddal pump station, pipeline installations and a pump station for connection points on existing pipelines in Mjøsa, Furnesfjorden. Phase II consists of laying a new main pump pipeline from the connection point in Brumunddal to manhole K5/8496 including the establishment of a new back-up pipeline from Storhamarstranda to manhole K5/8496.
The project has very strict schedules as the new stations together with the pipeline installations in Brumunddal must be completed by 17.1.2017. It is only possible to cross under the E6/Strandvegen and excavate the land abutment when the water level is low (15.2.-15.4.2016). Connecting the pipeline installations in Mjøsa shall be carried out before 17.1.2017 and measures must be taken so that the area where the cutting and connecting (welding) shall be carried out is ice-free.
Hias IKS would like to prequalify a selection of contractors for this work via this notice. See the detailed descriptions in each prequalification document.

Frist

Fristen for mottak av tilbud var 2015-06-18. Anskaffelsen ble publisert 2015-05-08.

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2015-05-08 Kunngjøring av konkurranse
2015-06-17 Tilleggsinformasjon
Kunngjøring av konkurranse (2015-05-08)
Gjenstand
Anskaffelsens omfang
Tittel: Subsea pipelines
Antall eller omfang: See the prequalification documents 3094 - 03 - 04 - 05 - 06.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Undersjøiske rørledninger 📦

Prosedyre
Prosedyretype: Begrenset anbudskonkurranse
Tilbudstype: Innlevering for én eller flere delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Forsyningsenhet
Navn på tildelende myndighet: Hias IKS
Postadresse: Postboks 4065
Postnummer: 2306
Poststed: Hamar
Kontakt
Internettadresse: http://www.hias.no 🌏
E-post: erik.bohleng@hias.no 📧
Telefon: +47 97657015 📞

Referanse
Datoer
Sendt dato: 2015-05-08 📅
Innleveringsfrist: 2015-06-18 📅
Publiseringsdato: 2015-05-13 📅
Identifikatorer
Kunngjøringsnummer: 2015/S 092-166381
OJ-S-utgave: 92

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Hias IKS has several pipelines with a high degree of sewage supply from the nutrition industry. The longest transfer is currently from Brumunddal to Rosenlundvika at Hamar, and then on to Tjuvholmen and the treatment plant in Stange. In Brumunddal the previous treatment plant is used as premises for pumping sewage southwards. The transfer from Brumunddal to Rosenlundvika was established in 1989/1990 and consists of 1 Ø 400 mm PE and 1 Ø 250 PE which are in daily operation.
Vis mer
A hotel shall be constructed on the site where the current pump station/treatment plan is and the new pump station shall therefore be established on a new site in Brumunddal. This means that the existing pipeliens must be altered. As the capacity of the pipelines is limited and the consequences of breaks in the pipelines are great, a new pipeline is wanted from Brumunddal and the existing pump pipelines will then be shut off and only used as back-up.
Vis mer
The project is planned to be carried out in 2 phases and four general contracts. Phase 1 consists of a new Brumunddal pump station, pipeline installations and a pump station for connection points on existing pipelines in Mjøsa, Furnesfjorden. Phase II consists of laying a new main pump pipeline from the connection point in Brumunddal to manhole K5/8496 including the establishment of a new back-up pipeline from Storhamarstranda to manhole K5/8496.
Vis mer
The project has very strict schedules as the new stations together with the pipeline installations in Brumunddal must be completed by 17.1.2017. It is only possible to cross under the E6/Strandvegen and excavate the land abutment when the water level is low (15.2.-15.4.2016). Connecting the pipeline installations in Mjøsa shall be carried out before 17.1.2017 and measures must be taken so that the area where the cutting and connecting (welding) shall be carried out is ice-free.
Vis mer
Hias IKS would like to prequalify a selection of contractors for this work via this notice. See the detailed descriptions in each prequalification document.
Delkontraktnummer: 1
Tittel på delkontrakt: Prequalification — Pipeline installations land abutment Brumunddal
Kort beskrivelse: See the prequalification document 3094-03.
Delkontraktnummer: 2
Tittel på delkontrakt: Prequalification — Submarine pipelines in Mjøsa
Kort beskrivelse: See the prequalification document 3094-04.
Delkontraktnummer: 3
Tittel på delkontrakt: Prequalification — The machine pump stations Brumunddal, Jessnes, Botsenden II and Framnes
Kort beskrivelse: See the prequalification document 3094-05.
Delkontraktnummer: 4
Tittel på delkontrakt: Prequalification — Building Brumunddal pump station
Kort beskrivelse: See the prequalification document 3094-06.
Beskrivelse av opsjoner:
Separate description of an option for welding submarine pipelines — See the prequalification document 3094-04.
Referansenummer: 3094
Utførelsessted
Hovedsted eller utførelsessted: Ringsaker, Hamar and Stange municipalities, Norway.

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: See the prequalification documents.
Økonomisk og finansiell stilling: See the prequalification documents.
Teknisk og faglig kapasitet: See the prequalification documents.

Prosedyre
Språk
Andre språk: Norwegian.

Oppdragsgiver
Identitet
Nasjonalt registreringsnummer: 947293265
Kontakt
Kontaktpunkt: Planning and consultancy services
Erik Bøhleng
Adresse til kjøperprofilen: https://kgv.doffin.no/ctm/Supplier/CompanyInformation/Index/3136 🌏
URL for dokumenter: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/131702 🌏

Referanse
Datoer
Startdato: 2016-02-01 📅
Sluttdato: 2017-01-17 📅
Startdato: 2016-05-02 📅
Sluttdato: 2017-06-01 📅
Startdato: 2016-08-01 📅
Kilde: OJS 2015/S 092-166381 (2015-05-08)
Tilleggsinformasjon (2015-06-17)
Gjenstand
Metadata for kunngjøring
Dokumenttype: Tilleggsinformasjon

Referanse
Datoer
Sendt dato: 2015-06-17 📅
Innleveringsfrist: 2015-07-01 📅
Publiseringsdato: 2015-06-20 📅
Identifikatorer
Kunngjøringsnummer: 2015/S 118-216259
Refererer til kunngjøring: 2015/S 92-166381
OJ-S-utgave: 118
Kilde: OJS 2015/S 118-216259 (2015-06-17)