Antall eller omfang
Main work that is included in the contract:— rigging work;— surveying;— technical checks and documentation;— temporary diversions;— moving/altering/demolishing existing cables, pipelines, street lights, etc.;— clearing vegetation;— excavating work;— road construction;— cycle path with a pavement and foot/cycle path;— laying covers;— setting up supporting walls;— kerbstones;— railings;— electrical work;— water and sewage work (pipelines, manholes, drains, etc.);— constructing a concrete culvert;— landscape work;— assembling signage;— road markings.Main quantities:— approximately 1400 m³ rock blasting for tunnel cutting and other cutting;— approximately 25 000 m³ blasted stone and earth removal;— approximately 3 000 m³ concrete;— approximately 280 tons reinforcement;— approximately 17 000 m² asphalt base course and wearing course.The list is not complete, the amounts are in chapter D1 — description (ISY-GPROG).The project will be carried out on the basis of drawings. Drawings are in chapter D2.