Project: National Road 5, HP 08 Loftesnes Bridge — Stedje X55 Parcel: Loftesnes Bridge

Statens vegvesen Region vest (The Norwegian Public Roads Administration, Western Region)

Construction of Loftesnes Bridge including roundabout and road adjustments on both sides as well as demolition of existing bridge.

Frist

Fristen for mottak av tilbud var 2015-09-24. Anskaffelsen ble publisert 2015-08-05.

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2015-08-05 Kunngjøring av konkurranse
Kunngjøring av konkurranse (2015-08-05)
Gjenstand
Anskaffelsens omfang
Tittel: Construction work
Antall eller omfang:
The work includes the construction of a new network arch bridge over Loftesnes Strait in Sogndal kommune. Length of the bridge is 194 m. Steel quantity approximately 1 250 t. 2 foundations in the sea with a total of 28 steel piles. Superstructure with concrete slab.In addition, the works also include the following:— Improvement of National Road 5 toward the centre of Sogndal, approximately 170 m,— New roundabout with special design due to challenging soil condition,— Filling and pitching in the sea at roundabout approximately 10 000 m3,— Improvement of National Road 55 from roundabout toward Luster, approximately 160 m,— Improvement of National Road 5 at Loftesnes toward Kaupanger, approximately 270 m,— New junction to Loftesnes and Barsnes and adjustments to local roads,— Completion and development of new land area at Loftesnes approximately 40 000 m2,— Adjustments and construction of new footpaths and side-walk,— Noise barriers on Loftesnes approximately 100 m,— Strengthening of existing bridge during the construction period,— Demolition of existing bridge after traffic is routed over the new bridge,— Removal of steel piles from trial piling.
Vis mer
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet 📦

Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Nasjonalt eller føderalt byrå/kontor
Navn på tildelende myndighet: Statens Vegvesen Region vest (The Norwegian Public Roads Administration, Western Region)
Postadresse: Askedalen 4
Postnummer: 6863
Poststed: Leikanger
Kontakt
E-post: firmapost-vest@vegvesen.no 📧
Telefon: +47 02030 📞
Faks: +47 57655986 📠

Referanse
Datoer
Sendt dato: 2015-08-05 📅
Innleveringsfrist: 2015-09-24 📅
Publiseringsdato: 2015-08-08 📅
Identifikatorer
Kunngjøringsnummer: 2015/S 152-281511
OJ-S-utgave: 152
Tilleggsinformasjon
The tender conference will take place 18.8.2015 at 10:30 at the meeting room, Nestangen, Sogndal.

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Construction of Loftesnes Bridge including roundabout and road adjustments on both sides as well as demolition of existing bridge.
Antall eller omfang:
The work includes the construction of a new network arch bridge over Loftesnes Strait in Sogndal kommune. Length of the bridge is 194 m. Steel quantity approximately 1 250 t. 2 foundations in the sea with a total of 28 steel piles. Superstructure with concrete slab.
Vis mer
In addition, the works also include the following:
— Improvement of National Road 5 toward the centre of Sogndal, approximately 170 m,
— New roundabout with special design due to challenging soil condition,
— Filling and pitching in the sea at roundabout approximately 10 000 m
— Improvement of National Road 55 from roundabout toward Luster, approximately 160 m,
— Improvement of National Road 5 at Loftesnes toward Kaupanger, approximately 270 m,
— New junction to Loftesnes and Barsnes and adjustments to local roads,
— Completion and development of new land area at Loftesnes approximately 40 000 m
— Adjustments and construction of new footpaths and side-walk,
— Noise barriers on Loftesnes approximately 100 m,
— Strengthening of existing bridge during the construction period,
— Demolition of existing bridge after traffic is routed over the new bridge,
— Removal of steel piles from trial piling.
Referansenummer: 2015/068235
Utførelsessted
Hovedsted eller utførelsessted: Sogndal, Norway.

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
1) Present tax certificate for VAT (National requirement),
2) Present tax certificate for tax (Natioal requirement),
3) Requirement to submit a declaration in accordance with Appendix 2 about Health Safety and the Environment.
Økonomisk og finansiell stilling:
1) Submit the company's Annual Financial Statement or drag this out,
2) Statement of the company's turnover in the last few years with relevance to this contract,
3) Requirement for the tenderer's economic and financial capacity,
4) Requirement that tenderer has their own equity.
Teknisk og faglig kapasitet: See the tender documentation.
Kontraktutførelse
Innskudd og garantier som kreves: See the tender documentation.
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: See the tender documentation.
Juridisk form som skal antas av gruppen av økonomiske operatører som kontrakten skal tildeles til: See the tender documentation.

Prosedyre
Tilbudets gyldighetsperiode: 2015-11-20 📅
Dato for åpning av tilbud: 2015-09-24 📅
Åpningssted (by): Leikanger
Informasjon om autoriserte personer og åpningsprosedyre: The tender opening is accessible for the tenderer.
Språk
Andre språk: Norwegian.
Vilkår for åpning av tilbud
Adresse: Askedalen 4

Oppdragsgiver
Identitet
Nasjonalt registreringsnummer: 971032081
Kontakt
Kontaktpunkt: Sogn Road Section, Statens vegvesen Region vest
Adresse til kjøperprofilen: https://kgv.doffin.no/ctm/Supplier/CompanyInformation/Index/2687 🌏
URL for dokumenter: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/134418 🌏

Referanse
Identifikatorer
Referansenummer tildelt av oppdragsgiver: 2015/068235
Kilde: OJS 2015/S 152-281511 (2015-08-05)