The bridge section in the eastern region is responsibility for Bjørvika submerged tunnel, which is a part of the Opera tunnel system. The bridge section would like to procure an automatic electronic tube leveller for the construction of the new Munch museum, which shall monitor settlement in the tunnel in the relevant area. The system shall continually send measurements via the GSM network. The tube leveller system shall go from profile 6317.5 to profile 6205 with 6 measuring points. The tunnel is close to rock with profile number 6317.5. This point is seen as a fixed point.
This contract includes:
— Engineering design services for and delivery of a tube leveller.
— Assembly of the tube leveller.
— Operatin and maintenance of the tube leveller.
Frist
Fristen for mottak av tilbud var 2015-08-18.
Anskaffelsen ble publisert 2015-07-07.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2015-07-07) Gjenstand Anskaffelsens omfang
Tittel: Construction structures and materials; auxiliary products to construction (except electric apparatus)
Antall eller omfang:
“This is a mixed contract for both supplies, services and works. The work will be divided into four phases: Phase 1 — engineering design services: It is...”
Antall eller omfang
This is a mixed contract for both supplies, services and works. The work will be divided into four phases: Phase 1 — engineering design services: It is assumed that the actual systems must be adapted to the tunnel and that this will require engineering design services for the placement, fixing, cabling and tube systems. There will also be a need for planning the assembly work as the time for assembly is limited.Phase 2, supplies: The supplies part of the assignment will be the production and delivery of the actual tube leveller system with datalogging and a transmission unit, as well as commissioning of the system when it has been assembled in the tunnel.Phase 3, works: This will consist of assembling the delivered tube leveller system in the Opera tunnel. The assembly work will mainly consist of fixing measuring units, wires and tubes on the tunnel wall, as well as connecting the system.Phase 4, operation and maintenance services: The operation and maintenance system starts after the system has been commissioned.This includes inspections and necessary maintenance of the system in order to prevent operational stoppages.The operation and maintenance of the system shall not be included in the chapter E, but will be paid as daywork.The operation and maintenance of the system shall be carried out for 2 years after the system has been commissioned.
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Nasjonalt eller føderalt byrå/kontor
Navn på tildelende myndighet: Statens vegvesen Region øst (The Norwegian Public Roads Administration, Region east)
Postadresse: Postboks 1010
Postnummer: 2605
Poststed: Lillehammer
Kontakt
E-post: firmapost-ost@vegvesen.no📧
Telefon: +47 91502030📞
Kunngjøring om tildeling av kontrakt (2016-02-17) Gjenstand Anskaffelsens omfang
Totalverdi for anskaffelsen: 2 522 750 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Kontraktens art: Tjenester
Prosedyre
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Statens vegvesen Region øst [The Norwegian Public Roads Administration, Eastern Region]