A municipal sector plan with impact assessment shall be prepared. The objective of the contract is to provide a formal basis for the new E39 section between Julbøen and the east centre of Molde. The connection to the existing E39 is intended to be at Bolsønes (Felleskjøpet). The requirement for a new E39 on the section is a result of the Norwegian Government's decision that the Romsdal Fjord shall be crossed by a tunnel and a suspension bridge between Vik in Vestnes municipality and Julbøen in Molde municipality.
Frist
Fristen for mottak av tilbud var 2016-01-26.
Anskaffelsen ble publisert 2015-11-23.
Kunngjøring av konkurranse (2015-11-23) Gjenstand Anskaffelsens omfang
Tittel: Architectural, engineering and planning services
Antall eller omfang:
“A municipal sector plan with impact assessment shall be prepared for the new E39 on the section Julbøen-Molde. The municipal sector plan shall be designed...”
Antall eller omfang
A municipal sector plan with impact assessment shall be prepared for the new E39 on the section Julbøen-Molde. The municipal sector plan shall be designed and contain a professional content that makes the plan in accordance with the Planning and Building Act, the Ministry of Climate and Environment's instruction manuals, the Norwegian Public Roads Administration's manuals and quality assurance routines. The plan shall also be formulated in such a way that it can be presented for a municipal resolution.Main elements:— 2 main alternatives for the section between Julbøen and the east centre of Molde shall be prepared. The contract also includes a review of an additional alternative with a tunnel branch to Reknes west of the centre, that shall together with E39 function as a short city tunnel for further relief of traffic from the centre. A separate sub-assessment on a superior level shall be prepared in order to evaluate the impacts of the extension of the tunnel, possibly the construction of a separate tunnel further east from Bolsønes to Leirgrovvika/Årø, c.f. description in section 2.4. In any case the Bolsønes area is an absolute destination point for an E39 tunnel from west. C.f the deliberation in the planning programme.See the tender documentation for further details.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Tjenester
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Arkitekt-, ingeniør- og planleggingstjenester📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Nasjonalt eller føderalt byrå/kontor
Navn på tildelende myndighet: The Norwegian Public Roads Administration, Region Mid-Norway
Postadresse: Julsundvegen 9
Postnummer: 6412
Poststed: Molde
Kontakt
E-post: firmapost-midt@vegvesen.no📧
Telefon: +47 02030📞