Antall eller omfang
Approx. main amounts for the road and foot/cycle paths:Work section 03 – 'Stormyra';Dual carriageway (national road 80) approx. 380 m;Single carriageway approx. 774 m;Foot and cycle path approx. 687 m;Roundabout national road 80 - Kirkeveien;Roundabout Kirkeveien - Junkerveien - Hålogalandsgata;Work section 04 – 'Bodøelv';Dual carriageway approx. 913 m;Single carriageway approx. 218 m;Foot and cycle path approx. 1 364 m;Car park area approx. 74 m;Roundabout national road 80;Roundabout Olav V. gate - national road 80;Work section 05 – 'Olav V. gate';Dual carriageway approx. 555 m;Single carriageway approx. 361 m;Foot and cycle path approx. 479 m;Roundabout Olav V. gate - Stormyraveien;Roundabout Olav V. gate - Gamle Riksvei;Work section - 06 'Thallekrysset';Dual carriageway approx. 250 m;Single carriageway approx. 243 m;Foot and cycle path approx. 402 m;Roundabout national road 80 –Thalleveien - Sandhorngate;Approx. main amounts B1 Cables:Cable ditches in earth and rock approx. 13 000;Cable conduits dimension 32-125 mm approx. 48 579 m;Conduit manholes, prefabricated 85;Approx. main amounts B2 water and sewage:;Surface water pipelines dimension 110-2 000 mm 6 037 m;Sand trap manholes, auxiliary drains, manholes,wastewater manholes, water manholes and special manholes 363;Approx. main amounts C1 road works:Matter removal of stone for filling 90 400 m³;Soil 126 315 m³;Frost protection layer of stone material;Layer thickness 780-1250 mm 46 893 m³;Reinforcement layer sorting 22/120 mm,;thickness 310-3 300 mm 42 208 m³;Levelling layer, crushed asphalt Ak 0/22 mm,thickness 50 mm 63 320 m²;Base course of asphalted gravel, Ag, thickness 90-140 mm;74 400 m²;Railings 1 549 mApprox. main amounts C2 landscape:;Stone cover/covering stone 13 299 m²;Natural stone walls, 3 525 m²;Natural stone kerbs 15 361 m;Two-sided supporting walls, wall height 1.5 m 630 lm;Green areas and slopes 83 790 m²;Planting trees 717;Planting bushes 6 821Planting perennials 10 547;Approx. main amounts C3 lighting:Metal masts 270;Street light fittings 265;Approx. main amounts constructions:;03K14 Stormyra bridge 81.2 m, three span;04K09 Bodøelv bridge, North 27 m, one span;04K10 Bodøelv bridge, South 27 m, one span;04K11 Foot/cycle path bridge, Bodøelv North 10,6 m, cross tensioned wooden bridge;04K12 Foot/cycle path bridge, Bodøelv South 10,6 m, cross tensioned wooden bridge;04K13 Culvert Olav V's. gt, North 25 m;04K28 Bodøelv bridge, middle 27 m, one span;05K17 Foot/cycle path culvert under Olav V. gate south 15 m;06K15 Culvert Thallekrysset, Sandhorngt 24 m;06K16 Culvert Thallekrysset, national road 80 21 m;Total concrete volume 5 340 m³;Total reinforcement rebar 720 tons.