Antall eller omfang
Jevnaker municipal waterworks shall replace the membranes on the waterwork's membrane rig. The contract includes the delivery of new membranes, disassembly of the existing membranes and assembly of the new membranes. The membrane rig has 70 pipes of 6 m, currently with four membranes per pipe, a total of 280 membranes shall be replaced.