Antall eller omfang
The work will consist of the construction of:— Pipeline installations open ditch DN800 water PE100 SDR13.6 DN L = 3 600 m with on site foundations/fillings and a ditch depth between 2.0 til 3.5 m.— Flushing pipeline approx. 20 m to a stream/drainage ditch.— Pipeline installations directional controlled drilling DN800 water PE100 SDR13.6. Three drilling places with a total of approx. 500 m. 1 at the road junction Sundbyveien 35 m, 1 at the road junction Nordmokorset 130 m, 1 at the residential area south of Nordmokorset 390 m, with 2 pits along the way for establishing a pipeline so that the overall length with escape places for the pipeline establishment is approx. 130 m.— One flushing manhole cast on site, approx. 4.2 x 4.7 m.— Eight airing manholes DN2000 BTG.— Conduits 3 x 40 mm PE for fibre length 4 100 m.— Twelve conduits for fibre.— Possible sheet pliling for pits for the flushing manhole, sheet piling pit 6 x 7 m, sheet piling length 10 m.— Site road, road width 3.5 m, length approx. 1.3 km with gravel 0.2 m.— Establishment of provisional site roads over cultivated land.— Re-establishment of drives and various surface work at the residential area south of Nordmokorset.