The government will simplify the initiative system, facilitate increased diversity of service providers of work orientated services and a better and more varied service offer to users An important part of this is the decision to merge the clarification and follow-up initiative from 1.1.2015. The amendment regulation dated 17.10.2014 means that the initiatives clarification and clarification in protected entities are merged to one clarification initiative and the initiatives follow-up and work with assistance are merged to one follow-up initiative. The alteration is a part of mobilising more suppliers and employers in ordinary work life who can offer job seekers an initiative place or a job. The regulation also includes a transition scheme for the initiatives that shall be phased out. The aim of the project is to examine whether the new clarification and follow-up initiatives contribute to: — An increased diversity of suppliers. — An improved and more varied service offer for users. — Simplification of the initiative system. A detailed description of the assignment's content and requirements of the assignment is given in Appendix 1 to the contract.
Frist
Fristen for mottak av tilbud var 2015-06-30.
Anskaffelsen ble publisert 2015-05-04.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2015-05-04) Gjenstand Anskaffelsens omfang
Tittel: Research and development services and related consultancy services
Antall eller omfang:
The assignment and problems that the Ministry would like to highlight are connected to two phases: The planning and commissioning phase (phase 1) and the implementation and result phase (phase 2). Sub assignment 1 shall be for phase 1 and the final report shall be for phase 2.An interim report shall be submitted for sub assignment 1. The final report shall cover sub assignment 2 and it shall consider the entire assignment. The reports shall be written in Norwegian. A summary of the final report shall be submitted in English.The contract has a total value of 1 400 000 NOK excluding VAT. The contracting authority aims to complete the assignment by 1.5.2018.If the progress of the project is delayed due to events beyond the tenderer's control, the Contracting Authority may consider extending the delivery deadline. See Appendix 1 for the delivery form and scope.The estimated value of the contract is not binding on the Contracting Authority.
The assignment and problems that the Ministry would like to highlight are connected to two phases: The planning and commissioning phase (phase 1) and the implementation and result phase (phase 2). Sub assignment 1 shall be for phase 1 and the final report shall be for phase 2.An interim report shall be submitted for sub assignment 1. The final report shall cover sub assignment 2 and it shall consider the entire assignment. The reports shall be written in Norwegian. A summary of the final report shall be submitted in English.The contract has a total value of 1 400 000 NOK excluding VAT. The contracting authority aims to complete the assignment by 1.5.2018.If the progress of the project is delayed due to events beyond the tenderer's control, the Contracting Authority may consider extending the delivery deadline. See Appendix 1 for the delivery form and scope.The estimated value of the contract is not binding on the Contracting Authority.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Tjenester
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Forsknings- og utviklingsvirksomhet og tilhørende konsulenttjenester📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Departement eller annen nasjonal eller føderal myndighet
Navn på tildelende myndighet: Arbeids- og sosialdepartementet
Postadresse: Pb 8019 Dep
Postnummer: 0030
Poststed: Oslo
Kontakt
E-post: roger.loras@asd.dep.no📧
Telefon: +47 22248619📞
The government will simplify the initiative system, facilitate increased diversity of service providers of work orientated services and a better and more varied service offer to users An important part of this is the decision to merge the clarification and follow-up initiative from 1.1.2015. The amendment regulation dated 17.10.2014 means that the initiatives clarification and clarification in protected entities are merged to one clarification initiative and the initiatives follow-up and work with assistance are merged to one follow-up initiative. The alteration is a part of mobilising more suppliers and employers in ordinary work life who can offer job seekers an initiative place or a job. The regulation also includes a transition scheme for the initiatives that shall be phased out.
The government will simplify the initiative system, facilitate increased diversity of service providers of work orientated services and a better and more varied service offer to users An important part of this is the decision to merge the clarification and follow-up initiative from 1.1.2015. The amendment regulation dated 17.10.2014 means that the initiatives clarification and clarification in protected entities are merged to one clarification initiative and the initiatives follow-up and work with assistance are merged to one follow-up initiative. The alteration is a part of mobilising more suppliers and employers in ordinary work life who can offer job seekers an initiative place or a job. The regulation also includes a transition scheme for the initiatives that shall be phased out.
The aim of the project is to examine whether the new clarification and follow-up initiatives contribute to:
— An increased diversity of suppliers.
— An improved and more varied service offer for users.
— Simplification of the initiative system.
A detailed description of the assignment's content and requirements of the assignment is given in Appendix 1 to the contract.
Antall eller omfang:
The assignment and problems that the Ministry would like to highlight are connected to two phases: The planning and commissioning phase (phase 1) and the implementation and result phase (phase 2). Sub assignment 1 shall be for phase 1 and the final report shall be for phase 2.
The assignment and problems that the Ministry would like to highlight are connected to two phases: The planning and commissioning phase (phase 1) and the implementation and result phase (phase 2). Sub assignment 1 shall be for phase 1 and the final report shall be for phase 2.
An interim report shall be submitted for sub assignment 1. The final report shall cover sub assignment 2 and it shall consider the entire assignment. The reports shall be written in Norwegian. A summary of the final report shall be submitted in English.
An interim report shall be submitted for sub assignment 1. The final report shall cover sub assignment 2 and it shall consider the entire assignment. The reports shall be written in Norwegian. A summary of the final report shall be submitted in English.
The contract has a total value of 1 400 000 NOK excluding VAT. The contracting authority aims to complete the assignment by 1.5.2018.
If the progress of the project is delayed due to events beyond the tenderer's control, the Contracting Authority may consider extending the delivery deadline. See Appendix 1 for the delivery form and scope.
The estimated value of the contract is not binding on the Contracting Authority.
Beskrivelse av opsjoner:
The Contracting Authority reserves the option for any additional purchase even beyond the specified time frame, and financial framework cf. the description of the assignment in Appendix 1. An hourly rate for additional work must be stated. This is not subject to allocation.
The Contracting Authority reserves the option for any additional purchase even beyond the specified time frame, and financial framework cf. the description of the assignment in Appendix 1. An hourly rate for additional work must be stated. This is not subject to allocation.
Referansenummer: 15/1492
Utførelsessted
Hovedsted eller utførelsessted: Oslo, Norway.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
Mandatory qualification requirements
Qualification requirement:
— Paid taxes and fees.
— Fulfilment of statutory requirements concerning health, safety and the environment.
Documentation requirement:
— Tax and VAT certificate; not older than six months, issued by a competent authority, confirming that the tenderer has fulfilled his tax, social security contributions and VAT payment obligations. A combined tax and VAT certificate can be ordered by tenderers from http://www.altinn.no/
— Tax and VAT certificate; not older than six months, issued by a competent authority, confirming that the tenderer has fulfilled his tax, social security contributions and VAT payment obligations. A combined tax and VAT certificate can be ordered by tenderers from http://www.altinn.no/
— Health, safety and environment (HSE). Self-declaration.
Legal status
— Legally established company.
— Company Registration Certificate.
Økonomisk og finansiell stilling:
Qualification requirement:
— Adequate economic and financial capacity to complete the delivery where among other things creditworthiness with no requirement for collateral will be sufficient.
Documentation requirement:
— A credit rating with key figures from a recognised credit assessment company or equivalent form of documentation to demonstrate that the requirement has been met.
Teknisk og faglig kapasitet:
Qualification requirement:
— The tenderer must be able to demonstrate at least 3 completed equivalent/similar assignments in the last three years that have relevance to this assignment. Equivalent or similar assignments means research of review assignments within the labour market and welfare questions and/or questions within public procurements.
— The tenderer must be able to demonstrate at least 3 completed equivalent/similar assignments in the last three years that have relevance to this assignment. Equivalent or similar assignments means research of review assignments within the labour market and welfare questions and/or questions within public procurements.
Documentation requirement:
— Reference list of the supplier's 3 (at least) equivalent or similar assignments in the past 3 (three) years with relevance to this assignment, and with the contracting authority's name and possible reference. The statement shall include what has been delivered and the role that the supplier had in the delivery.
— Reference list of the supplier's 3 (at least) equivalent or similar assignments in the past 3 (three) years with relevance to this assignment, and with the contracting authority's name and possible reference. The statement shall include what has been delivered and the role that the supplier had in the delivery.
Kontraktutførelse
Personalets navn og faglige kvalifikasjoner ✅
Prosedyre
Tilbudets gyldighetsperiode: 2015-09-20 📅
Språk
Andre språk: Norwegian.
Oppdragsgiver Identitet
Nasjonalt registreringsnummer: 983 887 457
Kontakt
Kontaktpunkt: Roger Lorås
Kunngjøring om tildeling av kontrakt (2015-09-21) Gjenstand Anskaffelsens omfang
Totalverdi for anskaffelsen: 1 400 000 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Arbeids- og sosialdepartementet (The Ministry of Labour and Social Affairs)
Referanse Datoer
Sendt dato: 2015-09-21 📅
Publiseringsdato: 2015-09-24 📅
Identifikatorer
Kunngjøringsnummer: 2015/S 185-336421
Refererer til kunngjøring: 2015/S 87-157926
OJ-S-utgave: 185
Prosedyre Tildelingskriterier
Kriterium: 1. Presentation of problems, method and data (45)
2. Competence, implementation ability and planning (45)
3. The total price for the assignment (10)
Tildeling av kontrakt
Dato for kontraktinngåelse: 2015-09-08 📅
Navn: Proba AS
Postadresse: Øvre Vollgate 6
Poststed: Oslo
Postnummer: 0158
Land: Norge 🇳🇴 Informasjon om tilbud
Antall mottatte tilbud: 4