Antall eller omfang
The following main work is included; approximate quantities:— Open air zone;— Seam drilling: 65 000 m;— Blasting: 210 000 pfm3;— Rock protection bots: 5 600 units;— Shotcrete: 550 m³;— Earth mass haulage: 350 000 pfm3;— Transportation of rock masses located in open air: 210 000 pfm3;— Sand traps in open air: 180 units;— Manholes for inspections in open air: 150 units;— Re-casted conduit sections: 3 600 m³;— Conduit manholes: 175 units;— Water and sewage pipes: 12 500 m;— Sub-base/frost proof support layer 190 000 pam3;— Asphalt masses: 44 000 tonnes;— Reinforcement: 3 600 tonnes;— Prestressed steel: 30 000 MNm;— Concrete, including nine walls: 25 000 m³;— Railings: 6 200 m;— Dry rock walls: 6 units, 1 000 m²;— Steel sheet piles: 3 000 m²;— Pipe sheet piles: 2 300 m²;— Noise-deflection walls: 3 000 m;— Bridges of which 1 is located below the railway: 7 units;— Demolition works: 7 sheds/car sheds, 500 m² brick walls, 1 100 m² noise deflection walls;— 80 manholes, 4,000 m pipes, 1 pump station;— Designed temporary road for construction purposes: 450 m;— Temporary rerouted roads: 200 m (An interim road at Grinden);— Temporary roundabouts: 2 units;— A lot of parallelism to the railway;— Tunnel;— The Svatås tunnel;— Profile 2 x 9.5 fully equipped, excluding electrical installations 1 530 m;— Frost protection in a floor with foam glass: 8 500 m³;— Technical buildings: 2 units;— Cross connections: 6 units;— Technical buildings in open air: 2 buildings;— The Kongsberg tunnel, a small section: Profile 1 x T9.5 and 1 x T12, fully equipped: 130 m. The assignments does not include electrical installation works;— Frost protection in a floor with foam glass: 550 m³;— Technical buildings in open air: 1 unit;— The Norwegian Public Roads Administration Southern Region, A3-3;— Project E134 Damåsen — Saggrenda;— Lots: 10 and 15 Myntbrua — Trollerudmoen;To be transferred from electrical contractors:— Road lighting foundations;— Foundations for variable signs and sign posts;— Foundations for cabinets and barriers;The project shall be executed both as model-based and draft-based.