Antall eller omfang
The following main work is included (approximate quantities):1. Road:— Blasting (rock) in the line 6 000 pfm3,— Stone matter from the cutting for the filling in the line 6 000 pfm3,— Earth in the line 14 000 pam3,— Crushed stone matter for the wearing course 300 pam3,— Crushed stone matter for the reinforcement layer 9 500 pam3,— Crushed stone matter for the frost protection layer 17 500 pam3,— Bitumen stabilising matter 30 000 m2,— Roundabout 1,— Junction 2.2. Structures:— 06-1994 Fiskumelva bridge length 88 m,— 06-1995 Darbu Southern railway culvert,— free height 5,00 m inside and a free width of 8,5 m.— Construction concrete 1 700 m3,— Formwork 2 350 m2,— Reinforcement 330 tons,— Tensioned reinforcement 3 800 mMN,3. Main amounts that shall be carried out during the operational interruptions on the railway:— Steel sheet piling 720 m2,— Excavating matter 4 200 m3,— Filling with rock matter 3 000 m3,— Filling with foam glass 400 m3.4. Water and Sewage:— Sand trap manholes 10,— Surface water manholes 17,— Water manhole 1,— Drainage pipeline 1 200 m,— Surface water pipeline 750 m,— Water and sewage pipeline 100 m,— Pipe pressing 60 m,— Holding magazine 492 m3.