The assignment shall be carried out in line with the commissioned party's operations permit under the Pollution Control Act. The assignment comprises the following: — Remove and treat hazardous waste from six storage containers of about 350 m³ drill cuttings and 423 m³ slop water. The containers must be cleaned, and the washing water must be treated as hazardous waste. — Empty tank 6 for oil residue from the TCC-process. The oil shall be transported and treated as hazardous waste. — Remove and ensure correct handling of the chemicals. — Analyze, remove and deposit solids from the TCC process in an approved landfill. During the period in which the assignment is carried out, and if there is still waste at the facility, the facility must be inspected at a minimum every 14th day where dangerous waste is inspected. Short status report must be sent to The Norwegian Environment Agency after each inspection.
Frist
Fristen for mottak av tilbud var 2014-04-23.
Anskaffelsen ble publisert 2014-03-07.
Kunngjøring av konkurranse (2014-03-07) Gjenstand Anskaffelsens omfang
Tittel: Radioactive-, toxic-, medical- and hazardous waste services
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Tjenester
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Tjenester i forbindelse med radioaktivt, giftig, medisinsk og farlig avfall📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Departement eller annen nasjonal eller føderal myndighet
Navn på tildelende myndighet: Miljødirektoratet
Postadresse: PB 5672 Sluppen
Postnummer: 7485
Poststed: Trondheim
Kontakt
Internettadresse: http://www.miljodirektoratet.no/🌏
E-post: ida.maria.evensen@miljodir.no📧
Telefon: +47 73580500📞
The assignment shall be carried out in line with the commissioned party's operations permit under the Pollution Control Act. The assignment comprises the following:
— Remove and treat hazardous waste from six storage containers of about 350 m³ drill cuttings and 423 m³ slop water. The containers must be cleaned, and the washing water must be treated as hazardous waste.
— Empty tank 6 for oil residue from the TCC-process. The oil shall be transported and treated as hazardous waste.
— Remove and ensure correct handling of the chemicals.
— Analyze, remove and deposit solids from the TCC process in an approved landfill.
During the period in which the assignment is carried out, and if there is still waste at the facility, the facility must be inspected at a minimum every 14th day where dangerous waste is inspected. Short status report must be sent to The Norwegian Environment Agency after each inspection.
During the period in which the assignment is carried out, and if there is still waste at the facility, the facility must be inspected at a minimum every 14th day where dangerous waste is inspected. Short status report must be sent to The Norwegian Environment Agency after each inspection.
Beskrivelse av opsjoner:
Wash six tanks and treat the washing water as hazardous waste.
Option: Clean six tanks previously filled with oil emulsions, and treat the washing water as hazardous waste. Tanks 1-5 have contained slop and water from the TCC process, while tank 6 has contained oil from the TCC process. We request a price on the option to clean these tanks, as well as treating the washing water from the cleaning as hazardous waste. The client can redeem the option before the end of the assignment.
Option: Clean six tanks previously filled with oil emulsions, and treat the washing water as hazardous waste. Tanks 1-5 have contained slop and water from the TCC process, while tank 6 has contained oil from the TCC process. We request a price on the option to clean these tanks, as well as treating the washing water from the cleaning as hazardous waste. The client can redeem the option before the end of the assignment.
Referansenummer: 14088092
Utførelsessted
Hovedsted eller utførelsessted: Sandnessjøen.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
Requirement : The supplier shall have arranged conditions regarding payment of taxes and VAT.
- Foreign suppliers must provide certificates from equivalent authorities to the Norwegian ones.
Requirement: The supplier must have a functioning HSE system.
Documentation requirement: HSE declaration.
Requirement: The supplier shall be a legally established enterprise.
Documentation Requirements: Norwegian companies: Company Registration Certificate. Foreign companies: Proof that the company is registered in a trade or business register as prescribed by the law of the country where the supplier is established.
Økonomisk og finansiell stilling:
Requirement: The supplier must have the financial capacity to carry out the assignment/contract.
Documentation requirement: Credit assessment/ rating based on the most recently available financial figures. A rating must be carried out by an official approved credit rating institution.
Teknisk og faglig kapasitet:
Requirement: The supplier must have permits for treatment of hazardous waste from petroleum activities, and experience with transport of hazardous waste.
Documentation requirement: - Permits for activities under the Pollution Control Act.
- Description of the supplier's most relevant contracts in the course of the last 3 years. The description must include the contract value, time frame and recipient (name, phone and e-mail of the reference person). Referees must be contactable if necessary to clarify the relevance of the contract.
- Description of the supplier's most relevant contracts in the course of the last 3 years. The description must include the contract value, time frame and recipient (name, phone and e-mail of the reference person). Referees must be contactable if necessary to clarify the relevance of the contract.
Requirement: The supplier shall have sufficient expertise, execution capability and capacity.
Documentation requirement: - Documentation demonstrating compliance with the competence requirement in the permit for activities under the Pollution Control Act. Documentation that all persons handling hazardous waste in the assignment have been trained.
Documentation requirement: - Documentation demonstrating compliance with the competence requirement in the permit for activities under the Pollution Control Act. Documentation that all persons handling hazardous waste in the assignment have been trained.
— Statement for technical equipment and for tools that will be necessary to carry out the assignment, hereunder means of transport for freight of hazardous waste, machines and other necessary materials.
Requirement: A well functioning internal control system and a clear environmental profile of the supplier are required.
Documentation requirement: - A short statement for the supplier's internal control system and environmental profile, and/or relevant certificates.
Kontraktutførelse
Personalets navn og faglige kvalifikasjoner ✅