Preparation of construction plans, tendering documents (drawings, description and bill of quantities) and working drawings for new pedestrian and cycle underpass on (National) Highway 80 at the intersection at Hunstad Centre in Bodø. The new Pedestrian-Bicycle path (PB-path), including culvert, will be approx. 400 metres. In addition, the establishment of a GS-path intersections of about 100 m and a walkway access of approximately 15 metres. The proposed culvert has a length of about thirty metres. The construction plans include planning of necessary interim solutions. The basis for the detailed design is the adopted zoning for: "Riksvei (Highway) 80 Pedestrian and bicycle underpass at Hunstad Centre". The assignment includes the preparation of documents in accordance with Sections D1 and D2 of "Handbook 066". The drawings etc shall be prepared in accordance with Handbook 139. The description must be prepared using the G-PROG according to the SVV [Norwegian Public Road Administration] Process Code (latest versions). The contract shall commence immediately once the agreement is signed and be completed in accordance with the interim and final deadlines.
Frist
Fristen for mottak av tilbud var 2014-03-20.
Anskaffelsen ble publisert 2014-02-25.
Kunngjøring av konkurranse (2014-02-25) Gjenstand Anskaffelsens omfang
Tittel: Engineering services
Antall eller omfang:
The project is a sub-project in Bypakke Bodø in Bodø Municipality. Based on the adopted development plan (adopted 12.12.2013) the prepared complete construction plan shall be on a competitive basis (drawings, description and bill of quantities) and working drawings/documentation for new pedestrian-bicycle path underpass along Hwy 80 at the intersection of Hunstad Centre. The present background documents need to be considered, and the provider may need to initiate additional studies. All temporary and permanent measures must be included in the plan. Interfaces and adaptations to adjacent areas and infrastructures must be presented in detail. All temporary measures necessary to implement the project must be detailed. All planning should be done in close cooperation with the Norwegian Public Roads Administration.The contractor shall have a well-knit design team with the necessary expertise in road design, design of bridges and structures, electrical work (or energy, telecommunications and automation), water and sewage, geotechnical engineering, architecture, landscape architecture, environmental impact minimisation, etc.Key elements of the project:— 400 m pedestrian/bicycle path along Hwy 80, of which approx. 32 m. in a culvert. Determine whether there should be clear separation between pedestrians and cyclists, as well as marking out the direction for cyclists. Related to this, pay special attention to how to implement adaptations to existing facilities.— 100 m pedestrian/cycle path from pedestrian/cycle path along Hwy and 80 towards Hunstad Centre.— 15 m walking access from the PB-path to the Shell [station].— Design of the terrain adjacent to the pedestrian/cycle paths and culvert. Measures to preserve green spaces, aesthetics and minimal intervention in the landscape must be emphasised. Measures to prevent the spread of unwanted species must be described. Landscape architect expertise is required in shaping elements of the project. Coordinate with other disciplines/consultants to best ensure the project design.— Relaying of existing water and sewage pipes and design of new drainage ditch with conduit routes and pipes, handling of stormwater including pump, pumping station and sump pump with associated controls, piping to municipal storm water network, sand traps, manholes. Also includes description/design of interim solutions during the construction phase. Planning of drainage solution for pumping station must be coordinated with Bodø municipality.— The assignment includes quality assurance of mapped, existing pipes and design of new routes.— The Dev.plan contains proposed phase plans with temporary traffic solutions. The plans must be optimised and detailed. A description of the work is required with regards to restoration of the intersection including lighting systems after the culvert work is completed. It will be important for the solution to ensure accessibility and safety.— In-situ culvert: length 31.5 m, width 5 m, free height 3.5 m.— Vertical wall facing Hwy 80 with guardrails impervious to ploughed snow.— Sheet pile facing Hwy 80 - temporary construction to minimise interference with current Hwy 80.— Dry masonry wall facing the Shell station.— Aesthetic and functional design of structures. It is assumed that a sketch phase will be carried out to provide guidelines for the design of the structure. Proposals shall be submitted to the contracting authority for approval.— Existing electrical and communication cables must be re-positioned. The assignment includes mapping of existing pipes and design of new routes.Provision of electricity to the pumping station including management to storm water removal from the culvert. Also includes description/design of temporary solutions during the construction phase. The cabinet for pump control must be placed not to comprise an obstacle to pedestrians.— Coordinate control systems for pumping station towards Bodø municipality.— Lighting system. Aesthetic and functional design of lighting systems in the culvert, and change/adaptation/completion of existing road lighting.— Consideration shall be paid to whether it is necessary to perform additional drilling to map the rock surface in the culvert and possibly the sheet pile area. If sheet piles are to be used, all temporary and/or permanent sheet pile solutions must be planned in detail.— Assessment of noise during the construction phase and especially in relation to the sheet piling must be considered. Additionally, even the noise associated with other works must be assessed in relation to the required constraints stated in the tender documents.— Preparation of a SHE plan and Outer Environment plan for the execution phase.The contract also includes monitoring during construction and preparation of as-built drawings.
The project is a sub-project in Bypakke Bodø in Bodø Municipality. Based on the adopted development plan (adopted 12.12.2013) the prepared complete construction plan shall be on a competitive basis (drawings, description and bill of quantities) and working drawings/documentation for new pedestrian-bicycle path underpass along Hwy 80 at the intersection of Hunstad Centre. The present background documents need to be considered, and the provider may need to initiate additional studies. All temporary and permanent measures must be included in the plan. Interfaces and adaptations to adjacent areas and infrastructures must be presented in detail. All temporary measures necessary to implement the project must be detailed. All planning should be done in close cooperation with the Norwegian Public Roads Administration.The contractor shall have a well-knit design team with the necessary expertise in road design, design of bridges and structures, electrical work (or energy, telecommunications and automation), water and sewage, geotechnical engineering, architecture, landscape architecture, environmental impact minimisation, etc.Key elements of the project:— 400 m pedestrian/bicycle path along Hwy 80, of which approx. 32 m. in a culvert. Determine whether there should be clear separation between pedestrians and cyclists, as well as marking out the direction for cyclists. Related to this, pay special attention to how to implement adaptations to existing facilities.— 100 m pedestrian/cycle path from pedestrian/cycle path along Hwy and 80 towards Hunstad Centre.— 15 m walking access from the PB-path to the Shell [station].— Design of the terrain adjacent to the pedestrian/cycle paths and culvert. Measures to preserve green spaces, aesthetics and minimal intervention in the landscape must be emphasised. Measures to prevent the spread of unwanted species must be described. Landscape architect expertise is required in shaping elements of the project. Coordinate with other disciplines/consultants to best ensure the project design.— Relaying of existing water and sewage pipes and design of new drainage ditch with conduit routes and pipes, handling of stormwater including pump, pumping station and sump pump with associated controls, piping to municipal storm water network, sand traps, manholes. Also includes description/design of interim solutions during the construction phase. Planning of drainage solution for pumping station must be coordinated with Bodø municipality.— The assignment includes quality assurance of mapped, existing pipes and design of new routes.— The Dev.plan contains proposed phase plans with temporary traffic solutions. The plans must be optimised and detailed. A description of the work is required with regards to restoration of the intersection including lighting systems after the culvert work is completed. It will be important for the solution to ensure accessibility and safety.— In-situ culvert: length 31.5 m, width 5 m, free height 3.5 m.— Vertical wall facing Hwy 80 with guardrails impervious to ploughed snow.— Sheet pile facing Hwy 80 - temporary construction to minimise interference with current Hwy 80.— Dry masonry wall facing the Shell station.— Aesthetic and functional design of structures. It is assumed that a sketch phase will be carried out to provide guidelines for the design of the structure. Proposals shall be submitted to the contracting authority for approval.— Existing electrical and communication cables must be re-positioned. The assignment includes mapping of existing pipes and design of new routes.Provision of electricity to the pumping station including management to storm water removal from the culvert. Also includes description/design of temporary solutions during the construction phase. The cabinet for pump control must be placed not to comprise an obstacle to pedestrians.— Coordinate control systems for pumping station towards Bodø municipality.— Lighting system. Aesthetic and functional design of lighting systems in the culvert, and change/adaptation/completion of existing road lighting.— Consideration shall be paid to whether it is necessary to perform additional drilling to map the rock surface in the culvert and possibly the sheet pile area. If sheet piles are to be used, all temporary and/or permanent sheet pile solutions must be planned in detail.— Assessment of noise during the construction phase and especially in relation to the sheet piling must be considered. Additionally, even the noise associated with other works must be assessed in relation to the required constraints stated in the tender documents.— Preparation of a SHE plan and Outer Environment plan for the execution phase.The contract also includes monitoring during construction and preparation of as-built drawings.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Tjenester
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Ingeniørtjenester📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Nasjonalt eller føderalt byrå/kontor
Navn på tildelende myndighet: Statens vegvesen Region nord
Postadresse: Dreyfushammarn 31/33
Postnummer: 8002
Poststed: Bodø
Kontakt
Internettadresse: http://www.vegvesen.no/🌏
E-post: odd.marvin.jorgensen@vegvesen.no📧
Telefon: +47 75552830/92069848📞
Preparation of construction plans, tendering documents (drawings, description and bill of quantities) and working drawings for new pedestrian and cycle underpass on (National) Highway 80 at the intersection at Hunstad Centre in Bodø.
The new Pedestrian-Bicycle path (PB-path), including culvert, will be approx. 400 metres. In addition, the establishment of a GS-path intersections of about 100 m and a walkway access of approximately 15 metres. The proposed culvert has a length of about thirty metres. The construction plans include planning of necessary interim solutions.
The new Pedestrian-Bicycle path (PB-path), including culvert, will be approx. 400 metres. In addition, the establishment of a GS-path intersections of about 100 m and a walkway access of approximately 15 metres. The proposed culvert has a length of about thirty metres. The construction plans include planning of necessary interim solutions.
The basis for the detailed design is the adopted zoning for:
"Riksvei (Highway) 80 Pedestrian and bicycle underpass at Hunstad Centre".
The assignment includes the preparation of documents in accordance with Sections D1 and D2 of "Handbook 066".
The drawings etc shall be prepared in accordance with Handbook 139.
The description must be prepared using the G-PROG according to the SVV [Norwegian Public Road Administration] Process Code (latest versions).
The contract shall commence immediately once the agreement is signed and be completed in accordance with the interim and final deadlines.
Antall eller omfang:
The project is a sub-project in Bypakke Bodø in Bodø Municipality. Based on the adopted development plan (adopted 12.12.2013) the prepared complete construction plan shall be on a competitive basis (drawings, description and bill of quantities) and working drawings/documentation for new pedestrian-bicycle path underpass along Hwy 80 at the intersection of Hunstad Centre. The present background documents need to be considered, and the provider may need to initiate additional studies. All temporary and permanent measures must be included in the plan. Interfaces and adaptations to adjacent areas and infrastructures must be presented in detail. All temporary measures necessary to implement the project must be detailed. All planning should be done in close cooperation with the Norwegian Public Roads Administration.
The project is a sub-project in Bypakke Bodø in Bodø Municipality. Based on the adopted development plan (adopted 12.12.2013) the prepared complete construction plan shall be on a competitive basis (drawings, description and bill of quantities) and working drawings/documentation for new pedestrian-bicycle path underpass along Hwy 80 at the intersection of Hunstad Centre. The present background documents need to be considered, and the provider may need to initiate additional studies. All temporary and permanent measures must be included in the plan. Interfaces and adaptations to adjacent areas and infrastructures must be presented in detail. All temporary measures necessary to implement the project must be detailed. All planning should be done in close cooperation with the Norwegian Public Roads Administration.
The contractor shall have a well-knit design team with the necessary expertise in road design, design of bridges and structures, electrical work (or energy, telecommunications and automation), water and sewage, geotechnical engineering, architecture, landscape architecture, environmental impact minimisation, etc.
The contractor shall have a well-knit design team with the necessary expertise in road design, design of bridges and structures, electrical work (or energy, telecommunications and automation), water and sewage, geotechnical engineering, architecture, landscape architecture, environmental impact minimisation, etc.
Key elements of the project:
— 400 m pedestrian/bicycle path along Hwy 80, of which approx. 32 m. in a culvert. Determine whether there should be clear separation between pedestrians and cyclists, as well as marking out the direction for cyclists. Related to this, pay special attention to how to implement adaptations to existing facilities.
— 400 m pedestrian/bicycle path along Hwy 80, of which approx. 32 m. in a culvert. Determine whether there should be clear separation between pedestrians and cyclists, as well as marking out the direction for cyclists. Related to this, pay special attention to how to implement adaptations to existing facilities.
— 100 m pedestrian/cycle path from pedestrian/cycle path along Hwy and 80 towards Hunstad Centre.
— 15 m walking access from the PB-path to the Shell [station].
— Design of the terrain adjacent to the pedestrian/cycle paths and culvert. Measures to preserve green spaces, aesthetics and minimal intervention in the landscape must be emphasised. Measures to prevent the spread of unwanted species must be described. Landscape architect expertise is required in shaping elements of the project. Coordinate with other disciplines/consultants to best ensure the project design.
— Design of the terrain adjacent to the pedestrian/cycle paths and culvert. Measures to preserve green spaces, aesthetics and minimal intervention in the landscape must be emphasised. Measures to prevent the spread of unwanted species must be described. Landscape architect expertise is required in shaping elements of the project. Coordinate with other disciplines/consultants to best ensure the project design.
— Relaying of existing water and sewage pipes and design of new drainage ditch with conduit routes and pipes, handling of stormwater including pump, pumping station and sump pump with associated controls, piping to municipal storm water network, sand traps, manholes. Also includes description/design of interim solutions during the construction phase. Planning of drainage solution for pumping station must be coordinated with Bodø municipality.
— Relaying of existing water and sewage pipes and design of new drainage ditch with conduit routes and pipes, handling of stormwater including pump, pumping station and sump pump with associated controls, piping to municipal storm water network, sand traps, manholes. Also includes description/design of interim solutions during the construction phase. Planning of drainage solution for pumping station must be coordinated with Bodø municipality.
— The assignment includes quality assurance of mapped, existing pipes and design of new routes.
— The Dev.plan contains proposed phase plans with temporary traffic solutions. The plans must be optimised and detailed. A description of the work is required with regards to restoration of the intersection including lighting systems after the culvert work is completed. It will be important for the solution to ensure accessibility and safety.
— The Dev.plan contains proposed phase plans with temporary traffic solutions. The plans must be optimised and detailed. A description of the work is required with regards to restoration of the intersection including lighting systems after the culvert work is completed. It will be important for the solution to ensure accessibility and safety.
— In-situ culvert: length 31.5 m, width 5 m, free height 3.5 m.
— Vertical wall facing Hwy 80 with guardrails impervious to ploughed snow.
— Sheet pile facing Hwy 80 - temporary construction to minimise interference with current Hwy 80.
— Dry masonry wall facing the Shell station.
— Aesthetic and functional design of structures. It is assumed that a sketch phase will be carried out to provide guidelines for the design of the structure. Proposals shall be submitted to the contracting authority for approval.
— Existing electrical and communication cables must be re-positioned. The assignment includes mapping of existing pipes and design of new routes.
Provision of electricity to the pumping station including management to storm water removal from the culvert. Also includes description/design of temporary solutions during the construction phase. The cabinet for pump control must be placed not to comprise an obstacle to pedestrians.
Provision of electricity to the pumping station including management to storm water removal from the culvert. Also includes description/design of temporary solutions during the construction phase. The cabinet for pump control must be placed not to comprise an obstacle to pedestrians.
— Coordinate control systems for pumping station towards Bodø municipality.
— Lighting system. Aesthetic and functional design of lighting systems in the culvert, and change/adaptation/completion of existing road lighting.
— Consideration shall be paid to whether it is necessary to perform additional drilling to map the rock surface in the culvert and possibly the sheet pile area. If sheet piles are to be used, all temporary and/or permanent sheet pile solutions must be planned in detail.
— Consideration shall be paid to whether it is necessary to perform additional drilling to map the rock surface in the culvert and possibly the sheet pile area. If sheet piles are to be used, all temporary and/or permanent sheet pile solutions must be planned in detail.
— Assessment of noise during the construction phase and especially in relation to the sheet piling must be considered. Additionally, even the noise associated with other works must be assessed in relation to the required constraints stated in the tender documents.
— Assessment of noise during the construction phase and especially in relation to the sheet piling must be considered. Additionally, even the noise associated with other works must be assessed in relation to the required constraints stated in the tender documents.
— Preparation of a SHE plan and Outer Environment plan for the execution phase.
The contract also includes monitoring during construction and preparation of as-built drawings.
Varighet: 009 måneder
Referansenummer: 2014013088
Utførelsessted
Hovedsted eller utførelsessted: Bodø.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: See tender documentation.
Økonomisk og finansiell stilling: See tender documentation.
Teknisk og faglig kapasitet: See terms of the competition.
Kontraktutførelse
Innskudd og garantier som kreves: See Tender documentation.
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: See Tender documentation.
Juridisk form som skal antas av gruppen av økonomiske operatører som kontrakten skal tildeles til: See Tender documentation.
Utførelsen av tjenesten er forbeholdt et bestemt yrke:
Central approval.
The project requires central approval for projects in Action Class 3 for the following areas:
Construction Safety.
Water supply, sewerage and district-heating systems.
Outside areas and landscaping.
Geotechnical Engineering.
For designing electrical work, the company must be registered in the register of electrical companies and approved to design low voltage industrial facilities and low-voltage supply systems.
Personalets navn og faglige kvalifikasjoner ✅
Prosedyre
Tilbudets gyldighetsperiode: 003 måneder
Dato for åpning av tilbud: 2014-03-20 📅
Tildelingskriterier
Kriterium: 1. Price (70)
2. Description of how the assignment will be implemented (15)
3. Total expertise (15)
Språk
Andre språk: Norwegian