Antall eller omfang
Construction of 7.2 km road; 5.5 km ped/bike path, 5.5 km W&S system, and 5.5 km road lighting.Excavation/blasting: approx. 240,000 pfm3 soil / 20,000 pfm3 bedrockFilling in line: 100,000 pfm3Noise berms: 6,000 pfm3Mass to depot: 160,000 uam3Frost protection layer/reinforcement layer/base course from depot: 160,000 m3Reinforcement layer/ frost protection: approx. 70,000 m3.Asphalt: 90,000 m2Water and sewage system: 5,500 mRailings (all types): 5,600 mNoise barriers: 2,300 m2Road lighting: 5,500 metres.130 000 000170 000 000