Antall eller omfang
Avinor AS is currently planning the construction of an infrastructural extension at Stavanger Airport, Sola, - a 2 floor building with a base area of 920 square meters. The annex will be situated in an area subject to security and access control. This invitation to tender cover the base construction concrete work planned to be executed in the period of May to September 2014. The work will include delivery and ramming of approx. 65 concrete piles. The construction work at site shall be performed during evening shifts. Dismantling of existing load-bearing sandwich elements in the building front / facade. Concrete work, pile heads and cantilever slab on the ground, delivery and erection of pre-fabricated girders and covers in the floors including supplementary steel elements.