Antall eller omfang
Open road, tunnelsBlasting during the day: 531,000 m³Excavation during the day 329,000 m³Tunnel masses: 662,000 m³Filling: 147,000 m³Asphalt: 64,000 tonsRailings: 8,500 lmEikedalen Landfill: 30,000 m³Breimyr Landfill: 200,000 m³Langemyr Landfill: 250,000 m³Bridges, portals, uncompacted tunnelsFormwork: 49,000 m²Reinforcement: 4,000 tonsConcrete: 25,000 m³