Antall eller omfang
The items that are included in regards to the preparation of the site are:— Removal and collection of the vegetation cover both under shearing and during filling,— Collection of unserviceable substances (sediment pockets),— Blasting works of deep blasting are included,— Pitching in front of contour line 3 to contour line 5,— Filling in the sea is calculated against the surveyed seabed,— Superstructure.The access road is approx. two kilometers long.The following items are included in connection with the preparation of the access road:— Removal and collection of the vegetation cover,— Blasting works of deep blasting are included,— Excavated soil shall be moved to the industrial area,— Subbase / levelling course and sub-base,— Two layers of asphalt (binder course + wearing course),— Lighting,— Drainage System,— Crash barrier,— Wattle hurdle on the top of cut.Main quantities.Vegetation clearing. Approx. 90 000 m2.Collection of unused substances. Approx. 55 000 m3.Blasting of cutting during the day. Approx. 480 000 m3.Mass haulage. Approx. 460 000 m3.Render and set without the use of soil. Approx. 130 000 m3.Subbase. Approx. 38 000 m3.Asphalt 2 layers. Approx. 12 350 m2.Pitching. Approx. 8 500 m2.