Invitation to prequalification for EPC Contract: Cleaning of flue gas from coal-fired energy plant, cleaning of boiler water, pumping station for seawater and storage

Longyearbyen Lokalstyre, Bydrift KF

The scope of work is:
— NOx removal plants for two coal-fired boilers (preferably SNCR),
— flue gas dust removal plant, one common for both boilers (preferably electrostatic precipitator),
— flue gas SO2 removal plant, one common for both boilers (preferably seawater scrubber),
— cleaning plant for boiler water (reverse osmosis or evaporator),
— new building for cleaning equipment and cold storage (100 m2) and hot storage and workshop (180 m2),
— new pumping station containing the existing pumping station, new pumping station for seawater scrubber and oil separator,
— supplementary equipment like instrumentation, CMS, safety systems, electric systems etc.
All equipment shall be installed, commissioned and tested.

Frist

Fristen for mottak av tilbud var 2012-04-27. Anskaffelsen ble publisert 2012-04-13.

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2012-04-13 Kunngjøring av konkurranse
2012-04-25 Tilleggsinformasjon
Kunngjøring av konkurranse (2012-04-13)
Gjenstand
Anskaffelsens omfang
Tittel: services related to air pollution
Antall eller omfang: See II.1.5.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS)
Felles innkjøpsordliste (CPV)
Kode: Tjenesteytelser i forbindelse med luftforurensning 📦

Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regional eller lokal myndighet
Navn på tildelende myndighet: Longyearbyen Lokalstyre, Bydrift KF
Postadresse: P.O. Box 350, Svalbard
Postnummer: 9171
Poststed: Longyearbyen

Referanse
Datoer
Sendt dato: 2012-04-13 📅
Innleveringsfrist: 2012-04-27 📅
Publiseringsdato: 2012-04-17 📅
Identifikatorer
Kunngjøringsnummer: 2012/S 74-122519
OJ-S-utgave: 74
Tilleggsinformasjon
Contractor is invited to participate in the prequalification for the EPC turn-key Lump Sum contract: “Longyear Energy Works – Cleaning of flue gas, cleaning of water, pumping station and storage” at Longyear Energy Works in Longyearbyen at Svalbard. Longyearbyen Lokalstyre (the Local Government) owns and operates Longyear Energy works that produces electricity and district heating for Longyearbyen, Svalbard. The existing plant was commissioned in 1982 and is based on two coal-fired boilers producing steam to two generators for production of steam and district heating. Maximum effect of the plant is 11 MW electric power and 16 MW district heating. The plant has been operated according to a emission permit from 1983 that was replaced by a new one submitted 29.6.2001 (SFT 2007), put in force from the same date. The plant consists of two Burmeister & Wain coal-fired steam boilers with a capacity each of 40 tons/hour steam at 48 bar pressure and temperature of 460 °C. Only one is run at the time and the other is stand-by or in maintenance. The mean flue gas flow is about 31,000 Nm3/h, and temperature is about 135 °C. The moisture content is 3-5 % (v/v). Both dust, NOx and SO2 exceed the limit values in the new emission permit. The plant has a purification plant for feed water for the boilers. This is based on ion exchange technology. Longyear energy has decided to replace this with a more modern plant based on reverse osmosis or evaporator. The consumption of boiler water is 5 m3/h or 120 m3/day. The cleaning and purification plant shall be located in-doors, and a new extension of the existing building is planned, giving room for the new plants, storage areas and a workshop. The existing pumping station for cooling water is also to be renewed, and a new pumping station for sea water to the planned SO2 scrubber is also required. The two pumping stations will be placed in the same building which will be an extension of the existing pumping station. The existing pumping station for sewage from the plant shall also be included in the extended pumping house, and a new oil separator for the sewage shall also be installed. The request for prequalification can be sent by E-mail to anton.rinnan@oec.no.
Vis mer

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
The scope of work is:
— NOx removal plants for two coal-fired boilers (preferably SNCR),
— flue gas dust removal plant, one common for both boilers (preferably electrostatic precipitator),
— flue gas SO2 removal plant, one common for both boilers (preferably seawater scrubber),
— cleaning plant for boiler water (reverse osmosis or evaporator),
— new building for cleaning equipment and cold storage (100 m2) and hot storage and workshop (180 m2),
— new pumping station containing the existing pumping station, new pumping station for seawater scrubber and oil separator,
— supplementary equipment like instrumentation, CMS, safety systems, electric systems etc.
All equipment shall be installed, commissioned and tested.
Varianter vil bli akseptert
Utførelsessted
Hovedsted eller utførelsessted: Longyearbyen, Svalbard.

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
1. Registered company name.
2. Address (both postal and visiting).
3. Contact person including telephone no. and e-mail address.
Teknisk og faglig kapasitet:
1. Relevant experience.
Please describe in a tabular form the five most relevant projects under execution or executed the last five years. The following details shall be provided:
— name of project,
— client, including contact person and contact details,
— approximate contract value,
— technology,
— capacities,
— location,
— start date and completion date,
— candidate's partners and main subcontractors.
2. Quality assurance.
Please supply a brief description of Contractor’s quality assurance system. The description shall include details regarding to which standard the quality system is approved or with which standard it complies.
3. Safety.
Please confirm that Contractor has an implemented and documented follow-up system for safety activities and describe the safety performance results achieved in the reference projects, ref. Section 1 above.

Prosedyre
Minste antall kandidater: 3
Største antall kandidater: 6
Objektive utvelgelseskriterier: Experience, quality and safety.
Språk
Språk: engelsk 🗣️

Oppdragsgiver
Identitet
Navn på tildelende myndighet: Longyearbyen Lokalstyre - Bydrift KF
Kontakt
Navn: OEC Consulting as
Postadresse: Lysaker Torg 25, Lysaker
Poststed: Oslo
Postnummer: 1366
Kontaktpunkt: OEC Consulting as
Anton Rinnan
Telefon: +47 67519600 📞
E-post: anton.rinnan@oec.no 📧
Faks: +47 67519601 📠
Postadresse: Send by E-mail

Referanse
Datoer
Startdato: 2012-08-01 📅
Sluttdato: 2014-09-01 📅
Tilleggsinformasjon
Contractor is invited to participate in the prequalification for the EPC turn-key Lump Sum contract: “Longyear Energy Works – Cleaning of flue gas, cleaning of water, pumping station and storage” at Longyear Energy Works in Longyearbyen at Svalbard.
Longyearbyen Lokalstyre (the Local Government) owns and operates Longyear Energy works that produces electricity and district heating for Longyearbyen, Svalbard. The existing plant was commissioned in 1982 and is based on two coal-fired boilers producing steam to two generators for production of steam and district heating. Maximum effect of the plant is 11 MW electric power and 16 MW district heating. The plant has been operated according to a emission permit from 1983 that was replaced by a new one submitted 29.6.2001 (SFT 2007), put in force from the same date.
Vis mer
The plant consists of two Burmeister & Wain coal-fired steam boilers with a capacity each of 40 tons/hour steam at 48 bar pressure and temperature of 460 °C. Only one is run at the time and the other is stand-by or in maintenance. The mean flue gas flow is about 31,000 Nm3/h, and temperature is about 135 °C. The moisture content is 3-5 % (v/v). Both dust, NOx and SO2 exceed the limit values in the new emission permit.
Vis mer
The plant has a purification plant for feed water for the boilers. This is based on ion exchange technology. Longyear energy has decided to replace this with a more modern plant based on reverse osmosis or evaporator. The consumption of boiler water is 5 m3/h or 120 m3/day.
Vis mer
The cleaning and purification plant shall be located in-doors, and a new extension of the existing building is planned, giving room for the new plants, storage areas and a workshop.
The existing pumping station for cooling water is also to be renewed, and a new pumping station for sea water to the planned SO2 scrubber is also required. The two pumping stations will be placed in the same building which will be an extension of the existing pumping station. The existing pumping station for sewage from the plant shall also be included in the extended pumping house, and a new oil separator for the sewage shall also be installed.
Vis mer
The request for prequalification can be sent by E-mail to anton.rinnan@oec.no.
Kilde: OJS 2012/S 074-122519 (2012-04-13)
Tilleggsinformasjon (2012-04-25)
Gjenstand
Metadata for kunngjøring
Dokumenttype: Tilleggsinformasjon

Referanse
Datoer
Sendt dato: 2012-04-25 📅
Innleveringsfrist: 2012-05-04 📅