Invitation to prequalification for EPC Contract: Cleaning of flue gas from coal-fired energy plant, cleaning of boiler water, pumping station for seawater and storage
The scope of work is:
— NOx removal plants for two coal-fired boilers (preferably SNCR),
— flue gas dust removal plant, one common for both boilers (preferably electrostatic precipitator),
— flue gas SO2 removal plant, one common for both boilers (preferably seawater scrubber),
— cleaning plant for boiler water (reverse osmosis or evaporator),
— new building for cleaning equipment and cold storage (100 m2) and hot storage and workshop (180 m2),
— new pumping station containing the existing pumping station, new pumping station for seawater scrubber and oil separator,
— supplementary equipment like instrumentation, CMS, safety systems, electric systems etc.
All equipment shall be installed, commissioned and tested.
Frist
Fristen for mottak av tilbud var 2012-04-27.
Anskaffelsen ble publisert 2012-04-13.
Kunngjøring av konkurranse (2012-04-13) Gjenstand Anskaffelsens omfang
Tittel: services related to air pollution
Antall eller omfang:
“See II.1.5.” Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS)
Felles innkjøpsordliste (CPV)
Kode: Tjenesteytelser i forbindelse med luftforurensning📦
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regional eller lokal myndighet
Navn på tildelende myndighet: Longyearbyen Lokalstyre, Bydrift KF
Postadresse: P.O. Box 350, Svalbard
Postnummer: 9171
Poststed: Longyearbyen
“Contractor is invited to participate in the prequalification for the EPC turn-key Lump Sum contract: “Longyear Energy Works – Cleaning of flue gas, cleaning...”
Contractor is invited to participate in the prequalification for the EPC turn-key Lump Sum contract: “Longyear Energy Works – Cleaning of flue gas, cleaning of water, pumping station and storage” at Longyear Energy Works in Longyearbyen at Svalbard.