Antall eller omfang
Orientating main amounts:— Excavating: 4 000 m3,— Blasting: 13 000 m3,— Rock securing bolts: 2 800 stk,— Shotcrete: 2 700 m3,— Insulated concrete wall elements: 9 500 m2,— Verge of PE-foam with net reinforced shotcrete: 16 000 m2,— Drainage / surface water pipelines: 170 m in tunnel, 30 m outside, 200 m to stream,— Pipe junction cast on site: 2 600 m,— Cable ditches: 2 100 m,— Reinforcement: 115 tons in concrete verge, 75 tons in technical building and shotcrete arches,— Concrete, technical building: 70 m3,— Emergency pavement with concrete cover: 2 500 m,— Kerbstone in tunnel: 2 500 m,— Cutting asphalt: 10 000 m2,— Asphalt: 1 400 tons.